Quantity Surveying, Estimation, Cost Control & CMS Software
Practical application of Quantity surveying, Estimation, Scheduling, Feasibility study; Cost Control + amazing Software
Description
It is a great chance to Save your time, money & effort. It is a great chance to improve your professional skills.
Welcome to Construction Quantity Surveying, Cost Estimation & Cost Control online training course. It is focused on the practical application of Quantity Surveying, Cost Estimation, Scheduling & Budgeting, Feasibility studying, and Cost Control using Auto Cad or PlanSwift & C.M.S Software “Construction Management System” -a 60 days License of CMS software is included within the course for FREE.
C.M.S is an amazing & easy tool & technic for construction projects to implement accurate & rapid processes of Quantities surveying, Cost Estimation, Scheduling & Budgeting, Feasibility, and Cost Control, and to provide the following output automatically by inserting minimum inputs:
* Accurate & rabid Quantity Surveying methods for all Construction Elements (Structure, Finishing, MEP, ..).
* Create the Construction Activities with detailed breakdown -automatically-.
* Create detailed Materials Take-off (Concrete, detailed Rebar, Shutters, Masonry, Plastering, Tiling, Sand, Cement, Mortar, Finishing,..) automatically.
* Create Activities Cost breakdown & cost estimation including direct cost (Labor, Materials & Equipment) & indirect cost using the Bottom-Up method – automatically-.
* Rate Analysis for different civil Works; Excavation, P.C.C, R.C.C, Masonry, Tiles, Plaster, etc..
* Obtain Manpower productivity for all civil works – automatically-.
* Create Projects budgeting including overhead, profit & Markup in easy steps.
* Create Priced Bill of Quantity as per CSI, POMI & CESMM Standards – automatically-.
* Create a control time schedule in easy steps.
* Create Manpower Cost & Histogram – automatically-.
* Create Outgoing & Income Cash flow – automatically-.
* Improve the cash flow to avoid the negative net cash flow.
* Create Resources (Manpower & Materials) S-curve through the project period.
* Create feasibility study & investment evaluation for the construction projects in easy steps.
* Making project management & Cost Control during execution in easy steps.
* Make Cost Coding & Actual cost recording.
* Make Resources (Labor & Materials) Control during execution in easy steps.
* Make Performances evaluation using Earned value management in easy steps.
* Forecast the project completion Cost (EAC, ETC) –automatically-.
* Create Progress Reports & Dashboards –automatically-.
You can easily Get the permanent CMS Platinum Software from the link included in the course Resources.
This course is a field-oriented course and contains real examples and a full real project for better understanding & simulation.
After completion of this course, you will be able to Estimate, Evaluate & Control the cost of any Building Construction Project (From Start to Completion).
For C.M.S “Construction Management System” Software; a 60 days Original License of the software is included within the course for FREE.
Major topics that we will learn & achieve in this course:
Quantities Surveying & Activities Breakdown for:
all the construction as per the Standard divisions & CSI master format, & Creating a detailed Bill of Quantities BOQ showing the following:
Division 01 — General Requirement
Division 02 — Site Construction
Division 03 — Concrete
Division 04 — Masonry
Division 05 — Metals
Division 06 — Wood and Plastics
Division 07 — Thermal and Moisture Protection
Division 08 — Doors and Windows
Division 09 — Finishes
Division 10 — Specialties
Division 11 — Equipment
Division 12 — Furnishings
Division 13 — Special Construction
Division 14 — Conveying Systems
Division 15 — Mechanical/Plumbing
Division 16 — Electrical
Division 17 — Others
Detailed Materials Take-off:
Earthworks, Excavation, Backfill, & Disposal
Concrete
Rebar in diameters
Shutters
Bricks & mortars
Plaster mortars
Cement
Aggregates
Tiles, Walls & Floors
Ceiling, Paints
Water
External Finishing
Sub-contracts Activities
Activities breakdown
And Creating detailed BOQ
Cost Estimation & implementation of the followings:
Cost Estimation Knowledge & Real project Practice according to AACE & PMBOK. & eventually, you will be able to find the following & create a huge amount of outputs & reports:
Cost Estimation Classifications
Cost Estimation Methods.
Cost Types.
Activities cost Breakdown
Direct cost
Indirect cost
Manpower cost
Activities total price
Work package cost estimation
Sub-contracts & Control Account cost
Projects reserves
Overhead & profit & Mark-ups.
Project baseline & Budget
Bids types
Final project Price
* Obtain Priced Bill of Quantities BOQ with the standard divisions.
Scheduling & Budgeting
Learning the Cost Estimation Knowledge & Real project Practice. You will be able to find the following & create a huge amount of outputs & reports:
Activities Productivities
Activities sequences & Relations Types
Develop Control Schedule
Resources & Manpower Histogram
Cost Baseline & Cash flow
Resources (Manpower & Materials) baselines
Planned monthly progress for each activity
The Monthly payments & the Net Cash flow
Project Budgeting
Feasibility Study
Learning projects Feasibility Evaluation Knowledge & Real Practice. You will be able to find the following & create a huge amount of outputs & reports:
Construction Development Expenses
Marketing & Selling Plan
Income & Out Cash flow
Net Cash flow
Project Financial Evaluation
Profit improvement
optimum Land price & sharing percentage.
Cost Control
Learning the Quantity Surveying Knowledge & Real Practice. You will be able to find the following & create a huge amount of outputs & reports:
Cost Coding & Actual Cost recording System
Earned Value Management EVM
Cost Performance Monitoring
Schedule Performance Monitoring
Resources Performance Control
Cost Forecasting
All Monthly Reports
Dashboards
What You Will Learn!
- Quantity Surveying & Cost Estimation in accurate & rabid method for all construction elements.
- Create detailed Breakdown for the Construction Activities automatically.
- Create detailed Materials Take-off automatically (Concrete, detailed Rebar, Shutters, Masonry, Plastering, Tiling, Sand, Cement, Mortar, Finishing,..)
- Create Activities Cost breakdown & cost estimation including direct & indirect cost using Bottom-Top method (Labor, Materials & Equipment) – automatically-.
- Obtain Manpower productivities for all civil works – automatically-.
- Create Projects budgeting including overhead, profit & Markup – automatically-.
- Create Priced Bill of Quantity as per POMI & CESME Standards Automatically.
- Create a control time schedule in easy steps.
- Create Manpower Man power Cost & Histogram – automatically-.
- Create Out going & Income Cash flow – automatically-.
- Create feasibility study & investment evaluation for the construction projects.
- Making project management & Cost Control during execution in easy steps.
- Making Resources (Labor & Materials) Control during execution in easy steps.
- Making Performances evaluation using Earned value management in easy steps.
- Forecasting the project completion Cost (EAC, ETC) – automatically-.
- Create Progress Reports & Dashboards – automatically-.
Who Should Attend!
- Civil Engineers
- Construction field interested
- Quantity Surveyors
- Construction Estimators
- Construction Managers
- Project Managers
- Those who wants to pursue a career as a Quantity Surveyor/ Estimator
- Civil Engineering Students