Primavera P6 Project Control

Enjoy Learning Primavera P6! From basics of primavera P6 we plan a project & reach the Advance level in Primavera P6

Ratings: 4.45 / 5.00




Description

In this Trip which we start Together you will learn from basic to advanced level of primavera to prepare a complete work schedule also analyzing and tracking of Duplex Villa with a user friend environment and with a lifetime Great Support:

(Please see the Course Content)


Basic

1. Why Scheduling?

2. Why Primavera?

3. Setting Up

4. General Acquaintance

5. Portfolio

6. OBS

7. EPS

8. Calendar

9. Project

Quiz 1: Primavera Basic Quizzes


Intermediate

10. WBS

11. Activity

12. Relationships

13. Important Notes ( Schedule, Log, Float)

14. Duration % Complete

15. Physical % Complete

16. Resources

17. Unit % Complete

18. Activity Codes

19. Baseline

Quiz 2: Primavera Intermediate Quizzes


Advanced

20. Update

21. Tracking

22. Analyze A (Earned Value Management)

23. Analyze B (Filtering Management)

24. Report

25. Visualizer

Quiz 3: Primavera Advanced Quizzes


Add-ons

26. Cash Flow (Advance payment and Retention Included)

27. Contract types

28. Admin Tabs

29. Expenses

30. Group & Sort

31. Filter Layout

32. Roles

33. Risks

34. WPs & Docs

35. Resource Leveling & Resource Curve

36. Cook WBS and Activity

37. Financial Period

38. print


+ Bonus:

39. Unknown Activity Delivery Date

40.Import & Export between Primavera and Microsoft Excel


++ Great Support and Constantly Updates


As the quality Course is so important for us, we have individual supports that you can ask your questions and issues from us and also we constantly check what is important and what do you need to know more from primavera to hasten your analyzes in projects.

We would be happy to see you in this Trip.



What You Will Learn!

  • Install Primavera 19.12 and Schedule a project as a project base from Basic to Expert.
  • Plan and set up the baseline for Duplex Villa.
  • Loading Cost and Resources and their configurations.
  • Methods of updating the plan. Duration %, Physical % and Unit % Complete.
  • How to update the project with Resources, Man-hour and Tracking.
  • Effective analyse of the plan by Using EVM (Earned Value Management) Method and New columns of Primavera (Labor Unit Base Data).
  • How to work with Visualizer.
  • How to prepare reports from the plan
  • How to draw Project S-curve (Plan & Actual) and real Cash-flow that includes Advance payment and Retention.
  • Also you Learnadditional important subjects such as Type of Contracts, Resource Leveling, Resource Curve, Risk and Documents input, Obtain Activity, Float, etc.
  • ++ Great individual Support

Who Should Attend!

  • Who is eager to learn scheduling, Controlling, Updating and Reporting the project effectively.